Specifies the rolled-up costs of outsourcing operations to a subcontractor.

This calculation adds up the total costs of outsourced operations in connection with producing the item on the line. This includes outsourced operations on those of its components that are production BOMs in themselves.

The program uses this field internally.

Tip

See Also