When using Maximum Qty. and Fixed Reorder Qty., the planning system focuses on the projected inventory in the given time-bucket only. This means that the planning system may suggest superfluous supply when negative demand or positive supply changes occur outside of the given time bucket. If, for this reason, a superfluous supply is suggested, the planning system calculates which quantity the supply should be decreased to (or deleted) to avoid the superfluous supply. This quantity is called the “overflow level.” The overflow is communicated as a planning line with a Change Qty. (decrease) or Cancel action and the following warning message:

Attention: The projected inventory [xx] is higher than the overflow level [xx] on the Due Date [xx].

Inventory overflow level

Calculating the Overflow Level

The overflow level is calculated in different ways depending on planning setup.

Maximum Qty. reordering policy

Overflow level = Maximum Inventory

Note
If a minimum order quantity exists, then it will be added as follows: Overflow level = Maximum Inventory + Minimum Order Quantity.

Fixed Reorder Qty. reordering policy

Overflow level = Reorder Quantity + Reorder Point

Note
If the minimum order quantity is higher than the reorder point, then it will replace as follows: Overflow Level = Reorder Quantity + Minimum Order Quantity

Order Multiple

If an order multiple exists, then it will adjust the overflow level for both Maximum Qty. and Fixed Reorder Qty. reordering policies.

Creating the Planning Line with Overflow Warning

When an existing supply causes the projected inventory to be higher than the overflow level at the end of a time bucket, a planning line is created. To warn about the potential superfluous supply, the planning line has a warning message, the Accept Action Message field is not selected, and the action message is either Cancel or Change Qty.

Calculating the Planning Line Quantity

Planning Line Quantity = Current Supply Quantity - (Projected Inventory - Overflow Level)

Note
As with all warning lines, any maximum/minimum order quantity or order multiple will be ignored.

Defining the Action Message Type

  • If the planning line quantity is higher than 0, then the action message is Change Qty.
  • If the planning line quantity is equal to or lower than 0, then the action message is Cancel

Composing the Warning Message

In case of overflow, the Untracked Planning Elements window displays a warning message with the following information:

  • The projected inventory level that triggered the warning
  • The calculated overflow level
  • The due date of the supply event.

Example: “The projected inventory 120 is higher than the overflow level 60 on 28-01-11”

Scenario

In this scenario, a customer changes a sales order from 70 to 40 pieces between two planning runs. The overflow feature sets in to reduce the purchase that was suggested for the initial sales quantity.

Item setup

Reordering Policy Maximum Qty.

Maximum Order Quantity

100

Reorder Point

50

Inventory

80

Situation before sales decrease

Event Change Qty. Projected Inventory

Day one

None

80

Sale

-70

10

End of time bucket

None

10

Suggest new purchase order

+90

100

Situation after sales decrease

Change Change Qty. Projected Inventory

Day one

None

80

Sale

-40

40

Purchase

+90

130

End of time bucket

None

130

Suggest to decrease purchase

order from 90 to 60

-30

100

Resulting Planning Lines

One planning line (warning) is created to reduce the purchase with 30 from 90 to 60 to keep the projected inventory on 100 according to the overflow level.

Note
Without the Overflow feature, no warning is created if the projected inventory level is above maximum inventory. This could cause a superfluous supply of 30.